Process time trackingIt is a header that affects the correct planning of the process in the Customs Regulations of Specialized. The authorized administration, control or permission process in some goods and operations may depend on special conditions. If the transaction point and document requirements are verified before the shipment plan, the final minute is reduced the risk of routing and waiting. Identify the starting/biting record for each stage, waiting for external drying and responsible person; set the threshold and escalation that will notice the delay early.
Risk control
Type the probable error, when it comes out and its effect separately. Preventive control, if the second control and problem to capture the error is formed, set the interfere step. Become a owner and the last review date of each control.
Control points
- Identify the product with technical specifications; remember that the commercial name is not enough alone.
- Check consistency between Beyan, invoice, origin, transportation, permission and compliance documents.
- Confirm the terms of the trade Ministry and the current resmî source of the relevant authorized institution.
Sample application
For example, when a business has prepared a transaction titled “Process time tracking”, it takes the purpose of processing and evidence of the hand. Then the related teams compare data, confirms missing information from the source and the approved version holds in the transaction file. When the procedure is completed, it compares and saves the difference and follow-up action.
Discussion question: What product/process information in this header gives you the most time to confirm before shipment?
This sharing is for general information and professional discussion. Up-to-date legislation, contract and product/procession properties should also be evaluated.
Current source: T.C. Ministry of Commerce — Customs clearance information bank bankası